01

Requirement

  • Core Objective(s) of Building the Website
  • Proposed UI and Platform/Framework Selection
  • User-Audience, Default Geo-locations and Languages.
  • Approval for Pseudo-Access.
  • Information for n-Architecture levels or user-roles & accessibility.
02

Analysis

  • Real-time Data collection under augmented scenarios.
  • End product feasibility check for Web-profitability.
  • Degree of Code-complexity
  • Degree of Automation of Website work-flow.
  • Analyzing short-term and long-term challenges.
03

Strategy

  • Detailing Ultimate Goal-preferences
  • Quantifying current status of product into distinct parameters for relatable stats.
  • Configuring (Installing) licensed and open-source Technologies and resources.
  • Plans to confront short-term as well as long-term challenges.
  • Module-Designing and automating independent regime for every sub-unit.
04

Design

  • Complete survey of brand expression (Business Niche)
  • Finalizing Mainframe Theme and Design with retrospective client interaction and suggestions.
  • Design for Admin and Management panel.
  • Thorough conversion of PSDs to design based Language (HTML5, CSS) and Validation.
  • Constant Approval of Development team for accurate WYSIWYG deployment at final step.
05

Development

  • Understanding entire functioning and navigation-flow in detail.
  • Coding Interface Panel for Admin Management.
  • Coding a Prototype Front-end Structure and Functioning.
  • Scenario Testing for Platform adaptability, User-end accuracy and E2E Security.
  • Optimizing and Validating Code without yielding functionality-domain and Security.
  • Labeling Prototype as final-development product after client approval.
06

Testing

  • Black box testing for confirming expected Outcomes per Page.
  • Anonymous user testing for confirming concept and design precision.
  • Testing for Different Devices and Platforms to recheck cumulative optimization.
  • Role Based Credentials and Accessibility check for Admin Panel.
  • BETA testing by bringing Product live and handling regressive Traffic.
07

Launch

  • Documentation for recursive or future plan of actions.
  • Eliminating Indexing Errors and clearing plot for Marketing the Product.
  • Handing over the Project. (Licensed Usage, Copyright Ownership etc.)
  • Planning launch day giveaways for customer base build-up.
08

Support

  • Documented Guide for monitoring and management of Panel.
  • Manual Training for advanced usage.
  • Eliminating technical cliches, if found
  • Support Validity up to 12 Months